Skip navigation
Please use this identifier to cite or link to this item: http://arks.princeton.edu/ark:/88435/dsp01vm40xv19r
Title: A Structural Analysis of the First Iron Bridge of 1779 by Abraham Darby III
Authors: Currier, Zach
Advisors: Glisic, Branko
Department: Civil and Environmental Engineering
Class Year: 2017
Abstract: This paper will research the First Iron Bridge built by Abraham Darby III in 1779 with the primary focus on conducting a structural analysis on the bridge in order to understand how the structure handles the load that are applied to it and how the forces flow through it before reaching the ground. The bridge was the first use of iron on such a large scale and changed bridge design forever. After this bridge was recognized by the engineering world it began the transition from wood and masonry bridges towards iron and then eventually steel which is used in many bridges today. The main challenges were accessing the detailed data needed as allof the primary sources are held in the UK and creating an accurate numerical model based on which the analysis was made.
URI: http://arks.princeton.edu/ark:/88435/dsp01vm40xv19r
Type of Material: Princeton University Senior Theses
Language: en_US
Appears in Collections:Civil and Environmental Engineering, 2000-2023

Files in This Item:
File SizeFormat 
Submitted_Thesis.pdf883.86 kBAdobe PDF    Request a copy


Items in Dataspace are protected by copyright, with all rights reserved, unless otherwise indicated.