Please use this identifier to cite or link to this item:
http://arks.princeton.edu/ark:/88435/dsp01r781wk25s
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Billington, David | - |
dc.contributor.author | Colecchia, Mario | - |
dc.date.accessioned | 2022-11-29T15:52:56Z | - |
dc.date.available | 2022-11-29T15:52:56Z | - |
dc.date.created | 1992-04 | - |
dc.date.issued | 1992 | - |
dc.identifier.uri | http://arks.princeton.edu/ark:/88435/dsp01r781wk25s | - |
dc.language.iso | en_US | en_US |
dc.title | The Two-Hinged Concrete Arch - A Preliminary Design for an Alternate to the Tacony-Palmira Bridge | en_US |
pu.date.classyear | 1992 | en_US |
pu.department | Civil Engineering and Operations Research | en_US |
dc.rights.accessRights | Walk-in Access. This thesis can only be viewed on computer terminals at the <a href=http://mudd.princeton.edu>Mudd Manuscript Library</a>. | en_US |
Appears in Collections: | Civil Engineering and Operations Research, 1931-2000 |
Files in This Item:
File | Size | Format | |
---|---|---|---|
AC102_Colecchia_Mario.pdf | 44.68 MB | Adobe PDF | Request a copy |
Items in Dataspace are protected by copyright, with all rights reserved, unless otherwise indicated.